Lang Wyatt is working with the City of Tucson and an architect to build this new $5 million facility on Tucson's east side for Tucson Water. The facility is located in a residential neighborhood, and was designed to minimize noise intrusion, as well as visual intrusion. Roof heights are kept at a lower elevation and slope with the site, and mechanical units are kept off the roofs. Building circulation and parking are in a compact area to minimize site impact.
The design is simple creative metal buildings which minimizes the cost of the facilities and allowed the budget to absorb equipment and systems desired by the client, including cranes, welding, training equipment, and furnishings. The building is LEED® registered and is expected to achieve a LEED® Silver Rating. Construction will be complete in 2009.
Other Projects
- City of Tucson Water Department
- Corona de Tucson Fire Station
- Sierra Vista Transit Transfer Center
- Green Valley Fire District -
Station 151 & 155